159 Acre Big Sky Solar Land Clearing Project in Rosanky, Texas

Proudly serving Rosanky, Texas

Acreage159 Acres
ServiceSolar & Utility Scale Clearing, Grubbing
EquipmentBarko 930B, 2 Komatsu PC360, Komatsu D85 and D39 Dozers
Days on site61 Days
CostQuoted
Barko 930B mulcher and Komatsu excavators clearing the 159 acre Big Sky Solar site in Rosanky Texas

Barko 930B mulcher and Komatsu excavators clearing the 159 acre Big Sky Solar site in Rosanky Texas

159 Acre Big Sky Solar Land Clearing Project in Rosanky, Texas

See all our land clearing work in Rosanky, TX.

Big Sky Solar in Rosanky handed us the scope most clearing contractors split in two: we ran both the mulching and the grubbing ourselves. 159 acres cleared for a utility scale solar site in 61 days, with a Barko 930B mulcher, two Komatsu PC360 excavators, and Komatsu D85 and D39 dozers working as one crew. It is the same playbook we ran on the 1,200 acre Cattlemen Solar build in Rosebud, sized to a tighter site in the Lost Pines country of Bastrop County.

Big Sky Solar Clearing in Rosanky, TX - 159 Acres, Both Scopes

The Barko 930B carried the surface clearing, taking the array areas down to a clean mulched finish. Behind it, the two PC360 excavators handled the below grade scope, grubbing root systems out of the pads, roads, and trenching corridors, and the dozers split the dirt work by weight class: the D85 on the heavy pushing and stacking, the D39 on finish work where the engineers needed compacted, root free soil rather than a mulched surface.

At 159 acres in 61 days the production math works out to roughly two and a half acres a day, and that number tells the honest story of dual scope work. Grubbing is below grade production, slower and heavier than mulch only clearing, and it is the part that decides whether the following trades can actually build on the ground you hand them. Running both scopes as one operation means no gap between the mulcher finishing and the dirt crew starting, and no second contractor to sequence around.

Frequently asked questions

What is the difference between grubbing and mulching on a solar site?

Mulching is surface work: the vegetation is cut and ground into a mulch layer, which is what the array areas need. Grubbing is below grade work: root systems come out entirely so the soil under roads, pads, and trenching corridors can be compacted. On Big Sky we ran both, the Barko 930B on the mulch scope and the PC360 excavators and dozers on the grubbing.

Why hire one contractor for both scopes?

Because sequencing two contractors is where solar schedules go to die. A mulching sub finishes, demobilizes, and the dirt contractor mobilizes behind them, and every handoff is a gap. We ran both scopes as one coordinated crew on Big Sky, releasing finished, verified sections continuously, which is a big part of how 159 acres wrapped in 61 days.

How long does it take to clear a site like this?

Big Sky ran 159 acres in 61 days, roughly two and a half acres a day. Mulch only clearing runs faster, but grubbing is slower, heavier, below grade production, and it is what makes the ground buildable. The date we commit to is production math built on the actual scope, not optimism, and this project held its window.

How is solar site clearing priced?

Scope priced. Acreage, vegetation density, the mulch spec, the grubbing zones, and the timeline set the number, and it goes on the table before mobilization. Big Sky, Cattlemen Solar, and Brownwood all finished on their timelines, and that record is exactly what you are buying.

Land clearing around Rosanky

We work the country around Rosanky regularly, across Bastrop County and the counties next to it.

Need clearing work around Rosanky?

Tell us the acreage and what you want left standing, and we will walk the property with you.