DEVELOPERS · CONTRACTORS · UTILITIES · RANCHES

Industries We Serve

Most of what we clear is somebody else’s critical path. A development phase, a grid connection date, an easement a crew has to get down next week. These pages are about how the work changes when you are a contractor or an owner with a schedule rather than a homeowner with a weekend.

Call or Text 512-400-2693 See the Sectors

SECTORS

Who We Clear For

Developers

Subdivision and development sites cleared in phases so your dirt contractor can start on phase one while we are still on phase three. Brownsville was 38 acres cleared for development in six days.

Civil Contractors

Clearing subbed to us so your crews stay on the work you are actually bidding. Written scope, machine days, and a finish somebody can inspect against.

Utility Contractors

Right of way, easements and corridor clearing on a utility standard. We cleared 127 acres for the LCRA on a public utility timeline in 37 days.

Municipalities

Public works, roadside and drainage clearing, with the insurance and documentation public clients have to have on file before a machine moves.

Ranch Development

Pasture back into production, roads that survive February, ponds, fence lines and hunting infrastructure. Usually several trades on one mobilization.

Industrial Projects

Pads, laydown yards, plant expansions and utility scale solar. Ten machines on 1,200 acres for 242 days is a scale most clearing contractors cannot staff.

WHAT CHANGES

What Is Different About Working With Contractors

The date is the deliverable

A homeowner wants it to look right. You want it done by the fifteenth because three trades are stacked behind you. We quote in machine days and then bring enough iron to answer to the date, rather than quoting a comfortable schedule and renegotiating it later.

Somebody is going to inspect it

On commercial and utility work there is usually a written spec, a particle size or a finish standard, and an inspector who measures against it. We have cleared to a fine mulch spec across 1,200 acres and to a utility standard for the LCRA. Tell us the standard and it drives machine choice and pass count.

Paperwork before machines

Insurance certificates, W-9s, safety documentation, whatever your contract or your public client requires. We are used to producing it rather than being surprised by the request. Tell us what your contract needs and we will send it.

Clearing, grubbing and excavation are three lines

They are three different machines doing three different jobs and they get quoted separately, because a lump sum that hides which is which is a lump sum you cannot value engineer later.

FAQ

Contractor and Owner FAQs

Do you work as a subcontractor?

Yes, and a lot of our contract work runs that way. You hold the client relationship and the schedule, we clear to a written scope inside it. What we ask for is the spec and the date in writing, because those two things decide the fleet.

How much land clearing can you do at once?

Ten machines on 1,200 acres for 242 days is the largest documented on this site. More usually the answer is two to four machines on a site for a few weeks. The date drives the fleet rather than the other way round, so tell us the deadline before you ask what it costs.

Are you insured for commercial and public work?

Yes, and we are used to producing the documentation that commercial, institutional and public clients require rather than being surprised by the request. Tell us what your contract needs and we will send it.

How is contract clearing priced?

In machine days at published rates, with clearing, grubbing and excavation as separate lines because they are three different machines. Past about fifty acres we quote the job rather than a day rate you multiply out. See published pricing.

What areas do you cover?

Statewide. Documented jobs on this site run from Brownsville to Weatherford and out to Brady and Tilden. Mobilization is a written line reflecting the distance.

Got a Scope and a Date?

Send the acreage, the spec if there is one, and the date you have to hit. You get machine days and a written quote, and the documentation your contract needs. Call 512-400-2693.

Call or Text 512-400-2693