SUBCONTRACT · SCOPE · SCHEDULE · SPEC

Land Clearing for Civil Contractors

You did not bid the job to spend three weeks of your own iron grinding cedar. We take the clearing and grubbing line off your schedule, work to a written scope inside your programme, and hand back ground your crews can start on. Ten machines on 1,200 acres is the largest we have run.

Call or Text 512-400-2693 See Documented Jobs

THE ARGUMENT

Why Sub the Clearing Out

Your machines are worth more on the work you bid

A dozer grinding brush is a dozer not moving dirt. On most civil jobs the clearing line is a few percent of the contract and a disproportionate share of the schedule risk, because it is the part with the least predictable production rate. Handing it to somebody who does only that is usually the cheaper arithmetic even when the line item looks higher.

Production rate is the thing you are buying

We run purpose built mulchers rather than a dozer with an attachment, and the difference on standing timber is not marginal. A day of a dedicated high horsepower machine covers about three acres of mixed growth. That predictability is what lets you put a real date on the trades behind you.

One scope, three lines

Clearing, grubbing and excavation are three machines doing three jobs and we quote them separately. On a civil job that matters because it is how you value engineer later, and because a lump sum that hides the split is a lump sum that becomes an argument at the first change order.

We are used to being the sub

You hold the client, the programme and the paperwork. We work inside it, produce the certificates and safety documentation before mobilization, and do not talk to your client about scope. That sounds obvious and it is not universal.

SCOPE

What We Take Off Your Schedule

Clearing and grubbing

Standing growth mulched or grubbed to whatever the drawings say. Grubbing is separate because it is a dozer or excavator taking root balls out ahead of a slab or a road bed, not a mulcher grinding at grade. See grubbing.

Right of way and corridors

Road corridors, easements and utility rows to a written clearance spec. We cleared 127 acres for the LCRA on a public utility timeline in 37 days. See right of way clearing.

Site prep to a graded pad

Cut and fill, rough and finish grading, pads, drainage and access. We stop at the pad: no utility trenching and no lime or cement stabilization. See site prep.

Clearing to an inspected spec

Fine mulch specs, particle size, clearance standards. We have cleared to a written mulch spec across 1,200 acres with an inspector measuring it. Send the standard at quote stage and it drives the machine and the pass count.

REVIEWS

Contractors on Working With Us

★★★★★

Preston, Dustin, and Steven just wrapped up an amazing job on an 800-acre commercial property. They were professional, dependable, hardworking, and transparent. I would highly recommend their services to anyone.

Nick Rodriguez, Google review

★★★★★

These days it is unusual to find services that are adequate, let alone exceed expectations. We had a very challenging project which required working around hundreds of boats on trailers, preserving legacy trees and navigating steep drop offs.

Bruce McDonald, Google review

★★★★★

I am a home builder in Baton Rouge Louisiana, but I am working on a pretty large project in Austin Texas. I have a lot of experience working alongside contractors in all trades. It is always most important to identify those that take pride in their work.

Alan Colby, Google review

FAQ

Civil Contractor FAQs

Do you work as a subcontractor?

Yes, and most of our civil work runs that way. You hold the client, the programme and the paperwork, and we clear to a written scope inside it. We produce insurance certificates and safety documentation before mobilization rather than being chased for them afterwards.

Why sub out clearing instead of self performing it?

Because a dozer grinding brush is a dozer not moving dirt. Clearing is usually a small share of the contract value and a large share of the schedule risk, since production rates on standing timber are the least predictable thing on the job. A dedicated mulcher covers about three acres of mixed growth a day, and that predictability is what lets you date the trades behind you.

How is subcontract clearing priced?

In machine days at published rates, with clearing, grubbing and excavation as three separate lines because they are three different machines. Past about fifty acres we quote the job rather than a day rate you multiply out. See published pricing.

Can you clear to a written specification?

Yes. Fine mulch specs, particle size, clearance standards. Rosebud was 1,200 acres to a written mulch spec with an inspector measuring it. Send the standard at quote stage, because it drives machine choice and pass count and a spec produced at walkdown is how a job gets rebid.

How many machines can you put on a job?

Ten is the most we have run at once, on 1,200 acres for 242 days. Two to four machines for a few weeks is the more usual answer. The date drives the fleet rather than the other way round, so give us the deadline before you ask what it costs.

Do you do the grubbing as well as the clearing?

Yes, and they are quoted separately because they are different machines. Mulching grinds standing growth at grade; grubbing takes root balls out with a dozer or excavator ahead of a slab or a road bed. Which one your drawings actually require is worth settling before bid rather than after.

Do you handle site prep and grading too?

Up to a graded pad with drainage and access. We do not trench utilities and we do not do lime or cement soil stabilization, so those stay with the trades that specialize in them. See construction site prep.

What areas do you cover?

Statewide. Documented contract work on this site runs from Brownsville to Weatherford and out to Tilden and Brady. Mobilization is a written line reflecting the distance.

Got a Clearing Line You Would Rather Not Self Perform?

Send the drawings, the acreage and the dates. You get machine days, three separate lines, and the insurance documentation your prime contract needs before we mobilize. Call 512-400-2693.

Call or Text 512-400-2693