Building pads, cut and fill, ranch roads and rock work across west Hays County. Limestone under thin soil, cedar over most of it, and a market that has been building on this ground for twenty years.
Dripping Springs sits on the Edwards Plateau and rock is not the exception here, it is the ground. Soil over the uplands is often a foot or less before limestone, Onion Creek and its tributaries have cut the country into ridges and draws, and cedar has taken whatever was not cleared. Every dirt number here starts with how deep the rock is and what it takes to get through it.
Limestone can sit under six inches of soil or under four feet, and it changes inside a single property. Sometimes it breaks with a toothed bucket, sometimes it needs a hammer, and sometimes milling the shelf to grade is faster and cheaper than trying to dig it out. We open the ground before quoting because there is no honest way to guess this.
There is rarely enough material on a Hill Country site to balance a cut and fill, so pads out here usually need select fill trucked in. That is the single most common surprise on this ground and we price it up front rather than discovering it on day two.
The full menu from our excavation and dirt work page, priced and planned for Dripping Springs ground.
Cut and fill is the whole job on most sites around Dripping Springs. Material comes off the high side, goes onto the low side, and gets compacted as it goes rather than pushed into place and hoped over. Balancing a site so nothing has to be hauled in or out is the cheapest version of this work, and where the ground allows it we will tell you.
Grading is what separates a site that drains from one that ponds. We shape positive fall away from every structure, tie it into somewhere the water can actually go, and finish to a surface that reads as landform rather than machine tracks. On hays county getting this wrong shows up the first wet season.
A pad is only as good as what is under it. Subgrade gets prepared, fill goes in compacted lifts to a spec, and the finished elevation is set against the drainage plan rather than the existing dirt. Barn pads, shop pads and house pads around Dripping Springs all get built the same way because the failure mode is the same.
Site prep is where our clearing side and our dirt side meet. Trees down, stumps and root balls out of the building footprint, ground cut to rough grade and handed to a builder ready for survey and permit. Doing both halves with one crew is faster and there is nobody to blame in the middle.
Ranch roads and driveways get built to survive rain, not just to look right on the day. Crown for shedding water, base rock spread and compacted to a real depth, and crossings where the water already wants to run. A road built without those three costs more in the second year than it saved in the first.
Ponds and stock tanks are dirt work with a water problem attached. The dam gets keyed into undisturbed ground and built in compacted lifts, the basin gets cut to depth, and the spillway goes in at the right elevation. Around Dripping Springs we will tell you honestly whether your ground will hold water before you commit.
The iron, the days, and the transport set the base. From there the site speaks: how much cut and fill, what compaction spec, what finish. Our day rates follow the same published logic as our clearing and pond work, so the quote can be sanity-checked against our own website. Photos to 512-400-2693 start the clock on a same-day ballpark.
Around Dripping Springs the number is rock first, fill second, access third. How deep the limestone starts and whether it digs, hammers or mills. How much material has to come in because the site cannot balance. And whether the drive can take a lowboy, which on a lot of these hillside tracts is a real question.
Pictures, a rough scope, and where the property sits. The ballpark comes back the same day, in machine days, off the same published logic as the rest of our site.
We probe, read the soil, check the access, and settle where the dirt should go while standing on it. No plan gets drawn from a satellite photo.
Machines, days, transport, and any rock or haul contingency, all in writing. The number you sign is the number you pay.
The lowboy delivers within a few weeks of a signed quote and the machines stay until the dirt is finished. No vanishing to other jobs mid-build.
Clearing first if the ground needs it, then cuts, compacted fills, and grade, in the order the finished site requires.
The last step is a lap around the work, checked against the quote. Anything short gets fixed before the machines load.
A pond is a dirt job with a water problem attached, and it is the same crew, the same machines and the same compaction standard as a building pad. The difference is that a pad fails slowly and a dam fails all at once.
Everything that matters happens in the dam. It gets keyed in so water cannot slide underneath it, built in compacted lifts rather than pushed up in one pass, and given a bank shallow enough to mow. Ponds almost never fail in the middle. They fail at the dam.
The spillway is the other half. Somewhere for overflow to go that is not across the dam, cut into undisturbed ground at the right elevation.
Around Dripping Springs that question gets answered with test pits, not optimism. If the ground will not hold water on its own we will say so and price the fix, whether that is a clay core, imported select fill or a sealed basin.
Depth beats width every time. Six feet at center is the baseline we build to, and it is why our pond pricing is quoted that way.
Real projects with full write-ups and photos. Every card opens the project page.
Every number on a dirt job comes back to what is under the surface, and the only honest way to know is to open the ground. We dig test holes on the site walk. It costs an hour and it is the difference between a quote you can rely on and a change order later.
Fill placed in one lift and tracked over looks identical to fill placed in compacted lifts, right up until something is built on it. We build to a spec and we are happy to have it tested. The pads that fail in Texas nearly all failed at this step.
Most dirt work that goes wrong went wrong because of water, not dirt. Where it comes from, where it sits and where it leaves are questions we answer before the first cut around Dripping Springs, because retrofitting drainage after concrete is the expensive way to learn it.
We clear the trees and we move the dirt, which means the stumps come out of the pad footprint properly instead of being someone else problem. On a site that needs both, that is usually days off the schedule and one less contractor to coordinate.
They did exactly what we agreed on. Rare these days. Dustin showed up early and did a nice job. Great to work with.
Miles Garwood, Google review
Fast response to my inquiries. Great to work with! They went above and beyond to help me out with some root balls and lots of trees from the ice storm. We will be using them again.
Eric Wood, Google review
Awesome experience! Polite, worked with us to get what we want and it looks fantastic! Highly recommend!
Mindy Fox, Google review
Priced by the machine day rather than by guesswork. Dozer and excavator work is $3,000 per day plus transport, with a one day minimum on every machine. What sets your number is how much material moves, whether fill has to be imported, and how deep the limestone starts and whether it digs, hammers or mills. Send photos and we will give you a real figure.
Yes, and it is usually cheaper to have one outfit do both. Trees down, stumps and root balls out of the building footprint, then straight into cut and fill with the same crew. On a site that needs clearing and dirt work, splitting it across two contractors adds days and a blame line in the middle.
Yes. Bring the plan set and we build to it, including compaction spec and finished elevations. If the plan and the ground disagree, which happens in Hays County more than people expect, we will flag it before we start rather than build something that has to be redone.
Scope priced, in machine days: the iron, the days, transport, and any flagged contingency. Send photos to 512-400-2693 for a same-day ballpark, then a site walk turns it into a written number that does not move after signing.
It gets planned for, not discovered. The site walk includes probing, and the quote carries a written contingency for ripping or hammering, billed by the day. The difference between outfits shows up at the first hard bucket, and ours is in writing.
We build pads in moisture-conditioned compacted lifts to plan elevations. If your engineer requires density testing we build to the spec and support the schedule, and if there is no engineer we build like there was one.
Photos and a rough scope get a same-day ballpark. A site walk gets a written number in machine days that does not move after you sign.