SERVING SEVEN POINTS & HENDERSON COUNTY, TX

Seven Points Land Clearing & Forestry Mulching

Lake lots opened up, yaupon mulched out, and post oak acreage cleared on the west side of Cedar Creek Lake. From Seven Points to Gun Barrel City, we turn brushed up land back into ground you can use.

Request a Free Quote

Tell us about your property. We usually reply the same day.

Takes about 30 seconds. No spam, no sales calls, just your quote.

The Land Around Seven Points

Land clearing in Seven Points, Texas is lake lot work at its core: yaupon out, oaks kept, views opened, and a clean finish next to the neighbors. The sandy ground grows understory fast, and our machines grind it in place with no burning and no hauling.

Around Seven Points, Gun Barrel City, Tool, and Mabank we handle lake lot clearing, yaupon and understory removal, building site prep for new lake houses, and acreage reclamation between the towns. The mulch layer stays, the soil stays put, and the lot is ready to use.

Pricing is straightforward. Skid steer mulchers run $3,000 per day with transport included. High horsepower dedicated mulchers run $4,000 per day plus transport. Photos or onX pins with the areas marked get most quotes done the same day. Call 512-400-2693 and a project manager will answer, seven days a week.

Forestry mulcher working across a field in Wimberley Texas
The mulcher working across open ground
Graded and cleared ground on a Fredericksburg removal job
Graded and cleared, ready for what is next

10,000+

Acres cleared across Central Texas

2,000+

Properties cleared since 2018

60

Texas counties served

8

Years In Service

Our Seven Points Land Clearing Services

A full service land clearing company serving Seven Points, Gun Barrel City, Tool, Kemp, Mabank, and all of Henderson County.

Forestry Mulching

Brush and small trees ground into soil-protecting mulch in one pass. No burning, no hauling.

Cedar & Ashe Juniper Removal

Cut the fire load, free the water table, and open sightlines on cedar-choked ground.

Brush & Underbrush Clearing

Reclaim overgrown lots, pastures, and fence lines from mesquite and scrub.

Tree & Stump Removal

Selective take-downs and stump grinding for clean, open ground.

Construction Site Prep

Grubbing, grading, and pad prep that hands your builder permit-ready dirt.

Rock Milling & Crushing

Old slabs, rubble, and rock crushed and milled on site into base material for drives and pads.

Fence Line & ROW Clearing

Clean corridors for new fencing, utilities, and access roads.

Lot Clearing

Residential and commercial lots cleared, leveled, and ready.

Pond & Tank Construction

Stock tanks and ponds dug, shaped, and finished right.

Who We Clear Land For

From half acre homesites to utility scale projects, the equipment and crew scale to the job.

Homeowners & Landowners

Utility corridors, pasture reclamation, invasive cedar and mesquite removal, and prep for whatever you are planning next.

Home Builders

Lot clearing, grubbing, and pad prep that keeps your build schedule on track.

Ranchers

Mesquite and cedar removal, pasture and grazing recovery, fence lines, senderos, stock tanks, and ranch roads.

Developers

Multi lot and large acreage clearing with ground left ready for survey, permitting, and infrastructure.

Solar Contractors

Utility scale site clearing, vegetation removal, and access roads for solar projects across Central Texas.

Right of Way & Utility Contractors

Transmission lines, pipelines, and fence and utility row corridors cleared to spec and on schedule.

Municipalities

Parks, drainage easements, fire mitigation, and public land maintenance. Easy to work with on bids and compliance.

Hunters & Recreational Owners

Senderos, food plots, feeder and blind access, and trail systems that make your property huntable again.

The Right Machine for Every Acre

A lot of land clearing companies rent whatever the equipment yard has that week. We own purpose-built forestry machines and match them to your terrain. Not sure which machine your property needs? Try our cost calculator for an instant answer.

Forestry Mulching 13

High Horsepower Dedicated Mulchers

Our high horsepower dedicated mulchers run 300+ HP and chew through heavy cedar and mesquite at a pace no skid steer can match. That is how big tracts get cleared in days instead of weeks. We bring these machines when your material runs bigger than 8 inches in diameter and the property has access for an 11 foot wide machine.

Land Clearing 6

Skid Steer Mulchers for Precision Work

For material up to 8 inches in diameter, our skid steer mulchers fill the gap. Subdivision lots, tree preservation, tight fence lines, and finish work around structures, they get in where the big machines cannot. Low ground pressure protects your topsoil, and they clear selectively around the oaks you want to keep.

Cleared ranch ground near Decatur TX

RECENT WORK NEARBY

Cedar Creek Lake Country, Cleared and Working

The photos on this page are from our documented post oak and cedar clearing across North and Central Texas, the same growth mix that fills in around Cedar Creek Lake, and every job we feature gets a full write up. Our 3 acre selective homesite clear at Cleburne shows the before and after treatment, and the carousel below leads with it.

Most recent documented project: July 2026

How It Works

1

Get Your Number

Send photos and property details for a fast quote, or meet us on-site and we will walk it with you. Either way you get a firm number, free.

2

Clear & Mulch

Our crew and machines do the work, selectively and cleanly. The mulch stays right where it falls, protecting the soil and feeding the grass. No burn piles, and no haul off needed.

3

Enjoy Your Cleared Property

You get open ground, clean sightlines, and land you can actually use again. If your project calls for full site prep, we handle that too.

What Land Clearing Costs in Seven Points

Every property is different, so price comes down to a few things: how many acres, how thick the growth is, what stays, and access. Transport to Henderson County is built into the quote up front, so the number you get is the number you pay.

Straight Day Rates, No Games

Most companies make you chase a number. Here is ours. The machine we bring depends on the size of your material and the access on your property.

High Horsepower Dedicated Mulcher

$4,000 / day

Plus transport to your site

Skid Steer Mulcher

$3,000 / day

Transport included

Day rates help you budget. When you send photos or have us walk the property, you get a firm total for the whole job, free either way. For a deeper breakdown, read our guide on what it costs to clear land in Texas.

What Customers Say About Working With Us

Rated 5 out of 5

Good communication. Professional. Worked fast but did a thorough job. The big mulcher did a great job of clearing land, including several large trees, and left a nice clean look.

Dow Fogleman

Google review

Rated 5 out of 5

I needed an easement squared-up, cleared and cleaned up. Spoke to the owner to get my quote. They scheduled and did a great job.

K Felix

Google review

Rated 5 out of 5

Can't say enough about the owner of this company. Hardworking guy who will do what it takes to get the job done.

Kat Kosmala

Google review

Permits in Seven Points

Clearing brush on rural Henderson County land needs no permit, and agricultural work is exempt from most regulation in Texas. Around the Cedar Creek Lake shoreline, the Tarrant Regional Water District has a say near the water. We flag anything that needs attention when we quote the job.

How Long Does It Take?

Estimates usually happen within a few days of your call. Most residential jobs run one to three days on site, and larger acreage moves at several acres a day with the dedicated mulchers. One local quirk: the Blackland clay east of I-35 gets greasy after rain, so we watch the weather and schedule around it rather than tearing up your ground. You get a start window with your quote and a heads up before we roll in.

Seven Points Land Clearing FAQs

Skid steer mulchers run $3,000 per day with transport included, and most Cedar Creek Lake lots are a one day job. Bigger acreage gets high horsepower machines at $4,000 per day plus transport. Send photos and the lot size for a real number, usually the same day.

That is the signature Seven Points job. We open the building site and the view corridor while keeping the oaks that matter, and hand the contractor a clean site. Shoreline rules get flagged in the quote.

Yes, it is the main event around Cedar Creek Lake. Yaupon fills in under the post oaks until the lot is solid, and we mulch it out from underneath without hurting the trees.

Nothing leaves the site. Everything grinds into a mulch layer that protects the sandy soil and breaks down naturally: no burn piles, no dumping, no haul off trucks.

In typical yaupon and post oak growth a dedicated mulcher covers 2 to 3 acres a day. Skid steers run about half to three quarters of an acre. We give you a day count with the quote.

No. We run statewide, transport is built into the quote up front, and the number you get is the number you pay.

Yes. Photos or an aerial screenshot with the lot lines marked will get most Seven Points quotes done the same day.

On rural Henderson County acreage, no. Agricultural clearing is exempt in Texas. Near the shoreline, water district rules can apply, and we flag anything that needs attention in the quote.

Real Projects, Linked and Documented

Selective Homesite Clear land clearing project by Pierce Land ClearingSelective Homesite ClearCleburne: shade trees kept, everything else gone in a day.See the full project →142 Acres, Miranda Solar land clearing project by Pierce Land Clearing142 Acres, Miranda SolarTilden: a failed site sifted, mulched, and brought back on spec in 16 days.See the full project →177 Acres, Dileo Solar land clearing project by Pierce Land Clearing177 Acres, Dileo SolarClifton: windrow and pile mulching to a fine solar spec, wrapped in 32 days.See the full project →159 Acres, Big Sky Solar land clearing project by Pierce Land Clearing159 Acres, Big Sky SolarRosanky: grubbing and mulching, both scopes self performed, wrapped in 61 days.See the full project →1,200 Acres, Cattlemen Solar land clearing project by Pierce Land Clearing1,200 Acres, Cattlemen SolarRosebud: fine mulch spec across 1,200 acres, 242 days, ten machines.See the full project →800 Acres, Chisme Solar land clearing project by Pierce Land Clearing800 Acres, Chisme SolarBrownwood: full clear to a fine mulch spec, wrapped in 154 days.See the full project →5 Acres, Trails Reopened land clearing project by Pierce Land Clearing5 Acres, Trails ReopenedLlano: impassable trails cleared and widened, cedar out.See the full project →8 Acres, Homesite Prep land clearing project by Pierce Land Clearing8 Acres, Homesite PrepSan Marcos: pad and driveway graded, cedar mulched for the views.See the full project →4.2 Acres, Selective land clearing project by Pierce Land Clearing4.2 Acres, SelectiveSan Antonio: heritage trees protected between a highway and new homesites.See the full project →12 Acres Grubbed in San Antonio land clearing project by Pierce Land Clearing12 Acres Grubbed in San AntonioSan Antonio: 12 acres grubbed and reclaimed as usable pasture.See the full project →18 Acres, Selective land clearing project by Pierce Land Clearing18 Acres, SelectiveEvant: 18 acres thinned selectively, hardwoods left standing.See the full project →Hunting Lane Clearing land clearing project by Pierce Land ClearingHunting Lane ClearingMelvin: hunting lanes cut and a new right of way opened.See the full project →40 Acres, Full Clear land clearing project by Pierce Land Clearing40 Acres, Full ClearBastrop County: cedar and yaupon off, pasture back in production.See the full project →12 Acres, Selective land clearing project by Pierce Land Clearing12 Acres, SelectiveGeorgetown: cedar out, every oak preserved.See the full project →Hilltop Homesite land clearing project by Pierce Land ClearingHilltop HomesiteHorseshoe Bay: one acre opened for a build with a view.See the full project →127 Acres for the LCRA land clearing project by Pierce Land Clearing127 Acres for the LCRAElgin: a full clear on a public utility timeline, wrapped in 37 days.See the full project →125 Acres Reclaimed land clearing project by Pierce Land Clearing125 Acres ReclaimedElgin: overgrown pasture put back to work.See the full project →38 Acre Commercial Site land clearing project by Pierce Land Clearing38 Acre Commercial SiteBrownsville: cleared for development in six days.See the full project →15 Acres of Solid Cedar land clearing project by Pierce Land Clearing15 Acres of Solid CedarHico: thick cedar taken down to open ground.See the full project →9 Acre Pasture Reclamation land clearing project by Pierce Land Clearing9 Acre Pasture ReclamationDale: brush out and grass coming back, two days on site.See the full project →6 Acres Mulched Clean land clearing project by Pierce Land Clearing6 Acres Mulched CleanMorgan: downed trees and brush ground in place.See the full project →3 Acre Homesite land clearing project by Pierce Land Clearing3 Acre HomesiteLexington: cedar removed, pad ready for the builder.See the full project →Cedar and Fence Lines land clearing project by Pierce Land ClearingCedar and Fence LinesLometa: three acres cleared with clean fence lines to match.See the full project →

Serving Seven Points & Henderson County

From Seven Points we cover Henderson County and the country around it: Gun Barrel City, Tool, Kemp, Mabank, Payne Springs. Close by we also serve Waxahachie, Red Oak, Fort Worth, Waco, Cleburne. Somewhere else in Texas? Browse every area we serve or just call.

Get Your Free Seven Points Land Clearing Estimate

Quick quotes, competent operators, and top of the line equipment. Dedicated project managers who actually answer the phone, and a family business that actually cares about making customers happy.