Pond Construction in McDade, Texas

Ponds, stock tanks and dams built across Bastrop County. Published pricing from $12,300, dirt crews that build ponds every week, and an honest answer on whether your ground will hold water.

Call 512-400-2693

$12,300Starting price
2 to 4Days on a quarter acre
6 ftDepth at center
4:1Bank grade

Pond Ground Around McDade

McDade is post oak sand country between Elgin and Giddings, and a lot of the calls here are not new ponds at all. They are old stock tanks that silted in over thirty years, or ponds that were dug in sand and never held. Both are fixable. A silted tank gets dredged back to depth and the spoil gets used to rebuild the dam. A pond that leaks gets a sealed basin, usually sodium bentonite worked into the bottom.

THE SOIL

Sand Is the Whole Question

Post oak sand drains, which is exactly what you do not want under a pond. Water finds the coarse layer and leaves.

That is why we open test pits before quoting. Finding clay at four feet changes the price in your favour. Finding sand all the way down means a clay core and probably a sealed basin, and it is better to know that before a machine shows up.

THE FIX

Core It, Then Seal It If It Needs It

A dam gets built with a clay core keyed into undisturbed ground, compacted in lifts. That is the part that holds water, not the outside of the dam.

If the basin itself will not hold, sodium bentonite gets worked into the bottom and compacted. It is an added cost and we quote it separately, but on sand it is the difference between a pond and a low spot.

What to Expect, Start to Finish

A pond is a dirt job with a water problem attached. Here is how one actually runs from the first call to the day it holds a pool.

1

The call

Send photos of the spot, a rough size, and your town. You get a ballpark from the published list the same day, and if it sounds right we set a time to walk the property. No pressure loop, no form-and-wait.

2

The site walk

We walk the property with you and dig test pits where the pond is going. Around McDade that is the step that decides the price, because whether there is clay under the sand changes the whole build. We would rather find out standing on the spot than halfway through.

3

The quote

A real number in machine days: what the dig costs, what the dam costs, what happens if we hit rock, and what the clearing adds if the site is brushed up. The price on paper is the price, and any rock contingency is spelled out instead of buried.

4

Mobilization

A lowboy shows up with the dozer and excavator, usually within a few weeks of a signed quote. We need a gate the iron fits through and a spot for the trailer, and we handle the rest.

5

Build days

Two to five working days for most ponds. Topsoil gets stripped and saved, the core trench gets cut, the dam goes up in compacted lifts, and the basin takes shape a bench at a time. You are welcome on site every day of it, at a safe distance from the swing radius.

6

The walkthrough

Before the machines load, we walk the pond with you: dam, spillway, slopes, and the topsoil dressed back over the banks. If it does not match what was quoted, that is the moment we make it right.

7

The wait for water

Rain fills ponds, not machines. In Bastrop County a new pond usually catches its first real water the season after it is built and reaches full pool across one or two wet seasons. Anybody who promises you a filled pond on a date is telling you what you want to hear.

2026 Pond Price List

Published, not hidden behind a form. Prices and build times are based on 6 feet of depth at center with a 4:1 bank.

Pond Size Starting Price at 6 ft depth, 4:1 bank Build Time
1/4 acre from $12,300 2 to 3 days
1/2 acre from $19,200 3 to 4 days
3/4 acre from $23,300 4 to 5 days
1 acre from $27,000 5 to 6 days
1 1/4 acre from $30,400 6 to 7 days
1 1/2 acre from $33,800 7 to 8 days
1 3/4 acre from $36,800 8 to 9 days
2 acre from $39,500 9 to 10 days

Sand is the variable around McDade. If test pits show the basin will not hold on its own, sealing is quoted separately and we will tell you before you commit, not after.

Price Your Pond in McDade

Size it, tell us what to do with the dirt, then draw the pond right on a photo of your land. Your estimate comes back by email, along with a preview of the finished water.

What Is In the Price, and What Is Not

No surprise line items. Here is how the number breaks down on every quote we write.

INCLUDED IN EVERY BUILD

The Whole Pond

Siting and design against your watershed, staking, topsoil stripped and saved, the core trench, the dam built in compacted lifts, the spillway cut and shaped, slopes finished to mow, and topsoil dressed back over the banks. Machine transport is in the quote, and so is the walkthrough before we leave.

QUOTED SEPARATELY WHEN NEEDED

The Site Variables

Basin sealing with sodium bentonite, imported select fill if there is no clay on the place, and rock if a shelf turns up unexpectedly. All quoted separately and always before the work, never after.

Documented Builds Near McDade

Real ponds, real day counts, photographed on site.

Excavator expanding an existing pond at the water line near Elgin TexasExcavator expanding an existing pond at the water line near Elgin, TX
Dozer and excavator building a third acre pond near Elgin TexasThird acre pond build near Elgin, TX
Excavator spreading sodium bentonite into a pond basinExcavator spreading sodium bentonite into a pond basin

Full process, statewide services, and the build standard: our Texas pond construction page.

What Makes a Pond Hold Water

The dam is the pond

Everything that matters happens in the dam. It gets keyed into undisturbed ground so water cannot slide underneath it, built in compacted lifts rather than pushed up in one go, and given a bank shallow enough to mow and safe enough to walk. A pond that fails almost never fails in the middle. It fails at the dam.

Depth beats width

A shallow pond grows algae, loses water to evaporation and warms up until nothing wants to live in it. Six feet at center is the baseline we build to and it is why our pricing is quoted that way. If you want fish, deeper is better than wider nearly every time.

The spillway is not optional

Every pond needs somewhere for the overflow to go that is not across the dam. An emergency spillway cut into undisturbed ground at the right elevation is what keeps a wet spring from taking your dam out. It is the cheapest insurance on the whole build.

What it costs to own

Very little, if it was built right. Watch the dam after heavy rain for seepage or slumping, keep trees off it because roots make channels, and expect to dredge silt out somewhere between year fifteen and year thirty depending on what drains into it.

Owning a McDade Pond

The first year

Expect the water to be cloudy and the banks to look raw. Both fix themselves. Get grass established on the dam as fast as you can, because bare dirt on a new dam is the one thing that will cost you real money if a hard rain arrives before roots do.

Stocking it

Wait until the pond has held a stable pool through a season before you put fish in it. Around McDade most owners go bluegill and minnows first, then bass the following year once there is something for them to eat. Your county extension office will give you a stocking rate for the acreage.

Keeping it clear

Most green water is nutrient, not dirt. Keep fertiliser and livestock runoff out of the catchment where you can, leave a grass buffer above the waterline, and give it time. Aeration helps a pond that stratifies in summer, and it is worth doing before chemicals are.

When to call us back

Seepage on the downstream face of the dam, a spillway that is cutting deeper each year, or a tank that has lost noticeable depth to silt. All three are fixable and all three get worse and more expensive the longer they run.

Beyond the Dirt: Finishing Your Pond

The build does not have to stop when the water shows up. These come with the same one-crew, one-call approach as the pond itself.

FINISH

Seeding & Erosion Control

Grass on a new dam is not cosmetic, it is what stops the first hard rain taking material off it. We seed and mat the dam and the disturbed ground around the basin as part of finishing.

WATER QUALITY

Aeration & Fountains

Aeration matters most on ponds deeper than they are wide, which is most of ours. It keeps the water from stratifying in an August and is far cheaper than treating a pond that has already gone bad.

ACCESS

Docks

Docks and access points get planned before the dirt work finishes, because it is much easier to shape a bank for a dock while the machines are still on site than to come back for it.

THE PAYOFF

Fish Stocking

Stocking is worth doing properly. We will tell you when the pond is ready and point you at the county extension rates rather than guessing at a number for you.

From Our Clients

★★★★★

I truly appreciate the integrity of this company and very competitive pricing. Very timely, and communication and payment options were great! I highly recommend this company and we will use them again.

David Scoggins, Google review

★★★★★

They did a phenomenal job cleaning up my 80 acres in Bellville of tree damage from the straight wind storm. Steve surveyed the property and gave me a quote that week, and Dustin worked diligently for 9 days to complete the project. Throughout, I got frequent updates. Outstanding team, outstanding job.

Doug Abbott, Google review

★★★★★

One word: FANTASTIC!! Thank you Pierce Land Clearing and special thanks to Dustin. We are so pleased!!

Dawn Buscho, Google review

Talk Pond Like a Dirt Crew

Six terms you will hear on the site walk, and what they actually mean for your water.

Core trench

A keyway cut below grade under the dam and packed with clay, so water cannot travel beneath the structure.

Compacted lifts

The dam built up in thin layers, each packed tight by the machine before the next goes on. The opposite of a pushed up pile.

Spillway

The armored low route storm water takes around the dam instead of over it. The difference between a rain event and a rebuild.

4:1 bank

Four feet of run for every foot of drop. Gentler banks are safer and easier to mow; steeper banks get more depth from less dirt.

Freeboard

The dry dam height above full pool, the safety margin that keeps a big storm inside the pond.

Watershed

Every acre of ground that sheds rain toward your pond. It, not the hole, decides how fast you get water.

Pond Builders Around McDade

We build ponds across Bastrop County and the country around it. Pick your town or call and tell us where the place is.

McDade Pond Construction FAQs

How much does a pond cost in McDade, TX?

Published on this page rather than hidden behind a form. Pricing starts at $12,300 and is based on 6 feet of depth at center with a 4:1 bank. The number moves with size, how far the spoil has to travel, and whether the basin needs sealing. Send us the spot and the size you want and we will give you a real figure.

Will my pond hold water?

Out here, often yes. Post oak sand does not hold water on its own. Most ponds around McDade need a clay core in the dam, and on the sandiest tracts a sealed basin as well, usually sodium bentonite worked into the bottom. We dig test pits before quoting so you are not guessing.

How long does a pond take to build?

Most quarter acre ponds are a two to four day build once machines are on site. Half acre runs longer. Weather is the variable nobody controls: we do not shape a basin in saturated ground because it will not compact, and a pond built on mud is a pond that seeps.

How long until it fills?

That is rain, not us. A pond in Bastrop County typically catches its first real water in the season after it is built and reaches full pool over one to two wet seasons. Anyone promising you a full pond on a schedule is guessing.

Do I need a permit to build a pond in Bastrop County?

On private land you own, a stock pond generally needs no permit in Texas, and agricultural water use is broadly exempt. It changes if you are damming a defined watercourse, working in a floodplain, or impounding above certain volumes. We will tell you when a call to the county or the river authority is worth making before a machine moves.

Can you fix a pond that leaks or has silted in?

Yes, and around McDade that is a good share of what we do. A silted tank gets dredged back to depth and the spoil usually goes into rebuilding the dam. A pond that will not hold gets the basin sealed. Rehabilitating an existing tank is normally cheaper than cutting a new one in a new spot.

Where should the pond go?

Where the water already wants to go. The best pond site is usually a natural draw with a catchment above it, not the flat spot nearest the house. We walk it with you before quoting, because moving a pond two hundred yards can be the difference between one that fills and one that never does.

What happens to all the dirt?

It stays on the property unless you want it gone. Spoil from the basin normally builds the dam, and what is left gets spread and shaped so it reads as landform rather than a pile. Hauling it off is possible and it costs extra, so we would rather find somewhere useful for it on the place.

Thinking About a Pond Near McDade?

Tell us the spot and the size you have in mind and we will give you a real number, including whether the ground will hold it.