SERVING GEORGETOWN & WILLIAMSON COUNTY

Excavation and Dirt Work in Georgetown, Texas

Pads, cut and fill, ranch roads and site prep across Williamson County. Limestone shelf west of I-35, blackland east of it, and a crew that has already cleaned up the San Gabriel after it flooded.

Call or Text 512-400-2693 Builds Near Georgetown

12 acresOn our documented Georgetown job
22+Documented projects with photos
2,400+Acres on documented jobs
10Machines on our biggest single job
GEORGETOWN GROUND

What You Are Digging In Around Georgetown

Georgetown sits right on the Balcones Escarpment and the ground changes character within a few miles. West and north of town it is limestone under shallow soil, where the question is how deep the rock starts and what it costs to get through it. East toward Hutto and Taylor it turns to deep blackland clay, where the question is water and timing instead. Most jobs here are one or the other, and pricing them the same way is how contractors get surprised.

West of I-35: rock, and how deep

Limestone shelf can sit under a foot of soil or under six. It does not stop a cut, it changes the machine and the day count, and on some sites it means milling rather than digging. We probe before quoting because guessing at rock depth is guessing at the price.

East of I-35: blackland and water

Deep clay that holds water and moves with the season. Pads get built in compacted lifts, drainage gets planned properly, and we do not shape ground that is saturated because it will not compact and the ruts outlast the job.

SERVICES

Dirt Work Services Around Georgetown

The full menu from our excavation and dirt work page, priced and planned for Georgetown ground.

Excavator working a cut over fresh spoil on a Central Texas excavation job

Excavation and Cut & Fill

Cut and fill is the whole job on most sites around Georgetown. Material comes off the high side, goes onto the low side, and gets compacted as it goes rather than pushed into place and hoped over. Balancing a site so nothing has to be hauled in or out is the cheapest version of this work, and where the ground allows it we will tell you.

Open graded ground after clearing on an Austin area site

Land Grading and Leveling

Grading is what separates a site that drains from one that ponds. We shape positive fall away from every structure, tie it into somewhere the water can actually go, and finish to a surface that reads as landform rather than machine tracks. On williamson county getting this wrong shows up the first wet season.

Cat D1 dozer clearing and grading a homesite pad in San Marcos Texas

Building and Barn Pads

A pad is only as good as what is under it. Subgrade gets prepared, fill goes in compacted lifts to a spec, and the finished elevation is set against the drainage plan rather than the existing dirt. Barn pads, shop pads and house pads around Georgetown all get built the same way because the failure mode is the same.

Excavator working near the Tesla factory corridor in Del Valle TX

Construction Site Prep

Site prep is where our clearing side and our dirt side meet. Trees down, stumps and root balls out of the building footprint, ground cut to rough grade and handed to a builder ready for survey and permit. Doing both halves with one crew is faster and there is nobody to blame in the middle.

Cleared caliche road corridor along the cedar line on an Austin area job

Ranch Roads and Driveways

Ranch roads and driveways get built to survive rain, not just to look right on the day. Crown for shedding water, base rock spread and compacted to a real depth, and crossings where the water already wants to run. A road built without those three costs more in the second year than it saved in the first.

Dozer and excavator building a fifth acre pond near Liberty Hill Texas

Pond and Tank Excavation

Ponds and stock tanks are dirt work with a water problem attached. The dam gets keyed into undisturbed ground and built in compacted lifts, the basin gets cut to depth, and the spillway goes in at the right elevation. Around Georgetown we will tell you honestly whether your ground will hold water before you commit.

PRICING

Pricing a Georgetown Dirt Job

What Sets the Number

Every quote is built from machine days: which machines, how many days, plus transport to your gate. No unit-rate mysteries and no allowances that balloon later. The logic is published across our site, so you can check our arithmetic. A few photos texted to 512-400-2693 get you a same-day range.

What Moves It Around Georgetown

Around Georgetown the biggest single variable is rock. A site west of I-35 that hits limestone shallow runs a different machine and a different number than the same job on blackland east of town. Haul distance for spoil and whether the drive can take a lowboy are the other two.

PROCESS

The Sequence on Every Georgetown Job

1Start with a text

Photos and a rough idea of scope get a same-day range in machine days. If the range works, we put a site walk on the calendar.

2Boots on the site

Rock gets probed, soil gets read, gates get measured. The whole plan is built standing on your ground, which is why our quotes hold.

3One page, real numbers

The quote lists machines, days, transport, and every contingency by name. Nothing lives in fine print because there is none.

4Mobilization

Iron arrives on the lowboy, stages where you point, and works the job continuously to the finish.

5Cut, fill, compact, grade

The sequence never changes because the physics never change. Fills go in as compacted lifts, grades finish to drain.

6Final walkthrough

You inspect the pads, slopes, and drainage against the plan with us. We load the machines when you are satisfied, not before.

DIRT WORK THAT HOLDS WATER

Ponds and Stock Tanks Around Georgetown

A pond is a dirt job with a water problem attached, and it is the same crew, the same machines and the same compaction standard as a building pad. The difference is that a pad fails slowly and a dam fails all at once.

THE DAM IS THE POND

Built in lifts, keyed into undisturbed ground

Everything that matters happens in the dam. It gets keyed in so water cannot slide underneath it, built in compacted lifts rather than pushed up in one pass, and given a bank shallow enough to mow. Ponds almost never fail in the middle. They fail at the dam.

The spillway is the other half. Somewhere for overflow to go that is not across the dam, cut into undisturbed ground at the right elevation.

WILL IT HOLD

We tell you before you commit

Around Georgetown that question gets answered with test pits, not optimism. If the ground will not hold water on its own we will say so and price the fix, whether that is a clay core, imported select fill or a sealed basin.

Depth beats width every time. Six feet at center is the baseline we build to, and it is why our pond pricing is quoted that way.

Georgetown pond construction

PROOF

Proof Within Driving Distance of Georgetown

Real projects with full write-ups and photos. Every card opens the project page.

FIELD NOTES

Field Notes for Georgetown Ground

Probe before you price

Every number on a dirt job comes back to what is under the surface, and the only honest way to know is to open the ground. We dig test holes on the site walk. It costs an hour and it is the difference between a quote you can rely on and a change order later.

Compaction is not optional

Fill placed in one lift and tracked over looks identical to fill placed in compacted lifts, right up until something is built on it. We build to a spec and we are happy to have it tested. The pads that fail in Texas nearly all failed at this step.

Water is the enemy of every pad

Most dirt work that goes wrong went wrong because of water, not dirt. Where it comes from, where it sits and where it leaves are questions we answer before the first cut around Georgetown, because retrofitting drainage after concrete is the expensive way to learn it.

One crew for clearing and dirt

We clear the trees and we move the dirt, which means the stumps come out of the pad footprint properly instead of being someone else problem. On a site that needs both, that is usually days off the schedule and one less contractor to coordinate.

REVIEWS

Clients on Our Work

★★★★★

Satisfied well beyond expectations! Taylor came in with a very competitive bid and prompt scheduling and was readily available for unforeseen last minute details. He also answered all phone calls and returned emails almost immediately.

Frank Henry, Google review

★★★★★

Pierce Land Clearing did an amazing job clearing our lot in Liberty Hill. It was wonderful working with them and I would highly recommend them for getting your job done right.

Devandar Reddy, Google review

★★★★★

The Pierce Land Clearing team did an excellent job on our property near Gonzales, Texas. Johnathan arrived, started, and finished on time. When the machine had a hydraulic issue, they sent a mechanic on-site, and still managed to complete the work as scheduled. We recommend them and plan to use them again.

J T viewer, Google review

FAQ

Questions Georgetown Clients Ask

What does dirt work cost in Georgetown, TX?

Priced by the machine day rather than by guesswork. Dozer and excavator work is $3,000 per day plus transport, with a one day minimum on every machine. What sets your number is how much material moves, whether fill has to be imported, and how deep the limestone starts on your side of I-35. Send photos and we will give you a real figure.

Do you handle the clearing too?

Yes, and it is usually cheaper to have one outfit do both. Trees down, stumps and root balls out of the building footprint, then straight into cut and fill with the same crew. On a site that needs clearing and dirt work, splitting it across two contractors adds days and a blame line in the middle.

Can you work with my engineered plans?

Yes. Bring the plan set and we build to it, including compaction spec and finished elevations. If the plan and the ground disagree, which happens in Williamson County more than people expect, we will flag it before we start rather than build something that has to be redone.

What happens if you hit rock?

It gets planned for, not discovered. The site walk includes probing, and the quote carries a written contingency for ripping or hammering, billed by the day. The difference between outfits shows up at the first hard bucket, and ours is in writing.

Will my pad pass compaction testing?

We build pads in moisture-conditioned compacted lifts to plan elevations. If your engineer requires density testing we build to the spec and support the schedule, and if there is no engineer we build like there was one.

Can one crew take the site from brush to build-ready?

Yes, that is the operation: clearing, grubbing, excavation, grading, and pads under one plan and one invoice. The gaps between contractors are where budgets die, so we removed the gaps.

Ready to Move Georgetown Dirt?

Photos and a rough scope get a same-day ballpark. A site walk gets a written number in machine days that does not move after you sign.

Call or Text 512-400-2693